2021 BMW M3
3.0 L • 6 • 473 hp • RWD
WBS53AY06MFL37453
Sales history: 1
Highlights
Condition
Run and drive
Seller
Insurance • USAA
Key included
Yes
Document status
Good
History
1 record
Drive
3.0 L • 6 • 473 hp • RWD
Odometer
21,598 mi ≈ 34,759 km
Primary damage
Front end
Document type
AL • Salvage
Extra
Auction
VIN
WBS53AY06MFL37453
Lot number
44033564
Copart
Sale status
Sold
Seller type
Insurance
Seller
USAA
Auction date
Location
Birmingham, AL
ACV
$66,517
Description
Fuel type
Gasoline
Body color
Blue
Body type
Sedan
Generation
G80
All sales final. Always run reports before bid
2021 BMW M3 • 3.0 L • 6 cyl • 473 hp • RWD • Copart Lot: 44033564 • VIN: WBS53AY06MFL37453
Find out more about this 2021 BMW M3, available at the Copart salvage car auction as lot 44033564 in Birmingham, AL. This car has Front end main damage. It is listed with Run and drive start condition code. Odometer shows 21,598 mi. This Blue BMW M3 Sedan is equipped with Gasoline 3.0 L engine, RWD drivetrain, transmission. Check the vehicle history report for WBS53AY06MFL37453 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.
Sharing our own experience
Over the years, we’ve learned all the ins and outs of car importing — so you don’t have to.
How it works
A full step-by-step guide that walks you through the entire process — from signing up to receiving your car at your doorstep. Clear & beginner-friendly.
Purchase process
Knowledge base
A structured library of content covering every major topic in car importing — including terms, rules, key concepts, and important real-world nuances.
Import encyclopedia
Watch & learn
Short, practical videos packed with tips from real experience. No fluff, no theory — just what actually helps when importing a car from the US to Poland.
Watch guides




































