2023 BMW M4 Competition xDrive
3.0 L • 6 • 503 hp • 4×4 • AT
WBS43AZ04PCL39055
Sales history: 1
Highlights
Condition
Not provided
Seller
Insurance • State Farm Insurance
Key included
Yes
Document status
Bad
History
1 record
Drive
3.0 L • 6 • 503 hp • 4×4 • AT
Odometer
29,554 mi ≈ 47,562 km
Primary damage
Water flood
Secondary damage
Minor dent scratches
Document type
Cert Destr
Extra
Auction
VIN
WBS43AZ04PCL39055
Lot number
59285034
Copart
Sale status
Sold
Seller type
Insurance
Seller
State Farm Insurance
Auction date
Location
Punta Gorda South, FL
ACV • ERC
$83,659 • $78,297
Description
Fuel type
Gasoline
Body color
Blue
Body type
Coupe
Generation
G82, G83
Trim
Competition xDrive
All sales final. Always run reports before bid
2023 BMW M4 Competition xDrive • 3.0 L • 6 cyl • 503 hp • 4×4 • Automatic • Copart Lot: 59285034 • VIN: WBS43AZ04PCL39055
Find out more about this 2023 BMW M4 Competition xDrive, available at the Copart salvage car auction as lot 59285034 in Punta Gorda South, FL. This car has Water flood main damage. It is listed with Not provided start condition code. Odometer shows 29,554 mi. This Blue BMW M4 Coupe is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS43AZ04PCL39055 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.
Sharing our own experience
Over the years, we’ve learned all the ins and outs of car importing — so you don’t have to.
How it works
A full step-by-step guide that walks you through the entire process — from signing up to receiving your car at your doorstep. Clear & beginner-friendly.
Purchase process
Knowledge base
A structured library of content covering every major topic in car importing — including terms, rules, key concepts, and important real-world nuances.
Import encyclopedia
Watch & learn
Short, practical videos packed with tips from real experience. No fluff, no theory — just what actually helps when importing a car from the US to Poland.
Watch guides




































