2021 BMW M4 Competition

3.0 L • 6 • 503 hp • RWD • AT

WBS33AZ05MCH43508

Highlights
Condition
Not provided
Seller
Unknown
Key included
Yes
Document status
Good
History
1 record
Drive
3.0 L • 6 • 503 hp • RWD • AT
Odometer
10,849 mi ≈ 17,460 km
Primary damage
All over
Document type
Rebuild Salvage
Extra
Auction
VIN
WBS33AZ05MCH43508
Lot number
66529012
Copart
Sale status
Sold
Auction date
Location
Miami South, FL
ACV • ERC
$89,075 • $66,134
Description
Fuel type
Gasoline
Body color
Silver
Body type
Coupe
Generation
G82, G83
Trim
Competition
All sales final. Always run reports before bid

2021 BMW M4 Competition • 3.0 L • 6 cyl • 503 hp • RWD • Automatic • Copart Lot: 66529012 • VIN: WBS33AZ05MCH43508

Find out more about this 2021 BMW M4 Competition, available at the Copart salvage car auction as lot 66529012 in Miami South, FL. This car has All over main damage. It is listed with Not provided start condition code. Odometer shows 10,849 mi. This Silver BMW M4 Coupe is equipped with Gasoline 3.0 L engine, RWD drivetrain, Automatic transmission. Check the vehicle history report for WBS33AZ05MCH43508 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.