2023 BMW M3
3.0 L • 6 • 473 hp • RWD • AT
WBS53AY04PFN87326
Sales history: 1
Highlights
Condition
Not provided
Seller
Insurance
Key included
Yes
Document status
Good
History
1 record
Drive
3.0 L • 6 • 473 hp • RWD • AT
Odometer
13,596 mi ≈ 21,881 km
Primary damage
Side
Secondary damage
Minor dent scratches
Document type
MD • Salvage >75% Damage
Extra
Auction
VIN
WBS53AY04PFN87326
Lot number
91688705
Copart
Sale status
Sold
Seller type
Insurance
Auction date
Location
Baltimore, MD
ACV • ERC
$73,302 • $26,716
Description
Fuel type
Gasoline
Body type
Sedan
Generation
G80
Body color
Gray
Plant country
Germany
All sales final. Always run reports before bid
2023 BMW M3 • 3.0 L • 6 cyl • 473 hp • RWD • Automatic • Copart Lot: 91688705 • VIN: WBS53AY04PFN87326
Find out more about this 2023 BMW M3, available at the Copart salvage car auction as lot 91688705 in Baltimore, MD. This car has Side main damage. It is listed with Not provided start condition code. Odometer shows 13,596 mi. This Gray BMW M3 Sedan is equipped with Gasoline 3.0 L engine, RWD drivetrain, Automatic transmission. Check the vehicle history report for WBS53AY04PFN87326 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.
Sharing our own experience
Over the years, we’ve learned all the ins and outs of car importing — so you don’t have to.
How it works
A full step-by-step guide that walks you through the entire process — from signing up to receiving your car at your doorstep. Clear & beginner-friendly.
Purchase process
Knowledge base
A structured library of content covering every major topic in car importing — including terms, rules, key concepts, and important real-world nuances.
Import encyclopedia
Watch & learn
Short, practical videos packed with tips from real experience. No fluff, no theory — just what actually helps when importing a car from the US to Poland.
Watch guides





































