2025 BMW M3 Competition xDrive

3.0 L • 6 • 523 hp • 4×4 • AT

WBS33HJ04SFU25148

LotAuction dateFinal bidSellerOdometerStatus
28.05.20251,166 miNot sold
25.06.2025$46,4501,166 miNot sold
27.06.2025$58,0501,166 miSold
Highlights
Condition
Run and drive
Seller
Unknown
Key included
Yes
Document status
Good
History
3 records
Drive
3.0 L • 6 • 523 hp • 4×4 • AT
Odometer
1,166 mi ≈ 1,876 km
Primary damage
All over
Loss type
Collision
Document type
CA • Salvage
Extra
Auction
VIN
WBS33HJ04SFU25148
Lot number
41942920
IAAI
Sale status
Sold by Buy now
Auction date
Location
Los Angeles, CA
ACV • ERC
$95,169 • $74,305
Description
Fuel type
Gasoline
Body color
Gray
Body type
Sedan
Generation
G80
Trim
Competition xDrive
All sales final. Always run reports before bid

2025 BMW M3 Competition xDrive • 3.0 L • 6 cyl • 523 hp • 4×4 • Automatic • IAAI Lot: 41942920 • VIN: WBS33HJ04SFU25148

Find out more about this 2025 BMW M3 Competition xDrive, available at the IAAI salvage car auction as lot 41942920 in Los Angeles, CA. This car has All over main damage. It is listed with Run and drive start condition code. Odometer shows 1,166 mi. This Gray BMW M3 Sedan is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS33HJ04SFU25148 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.