2022 BMW M3
3.0 L • 6 • 473 hp • RWD • MT
WBS53AY03NFL94517
Sales history: 2
Highlights
Condition
Not provided
Seller
Insurance
Key included
Yes
Document status
Good
History
2 records
Drive
3.0 L • 6 • 473 hp • RWD • MT
Odometer
96,679 mi ≈ 155,589 km
Primary damage
Front end
Secondary damage
Unknown
Loss type
Other
Document type
GA • Salvage
Extra
Auction
VIN
WBS53AY03NFL94517
Lot number
42026142
IAAI
Sale status
Sold by Buy now
Seller type
Insurance
Auction date
Location
Lake City, GA
ACV
$52,767
Description
Fuel type
Gasoline
Body type
Sedan
Generation
G80
Body color
Green
Interior color
Brown
Plant country
Germany
All sales final. Always run reports before bid
2022 BMW M3 • 3.0 L • 6 cyl • 473 hp • RWD • Manual • IAAI Lot: 42026142 • VIN: WBS53AY03NFL94517
Find out more about this 2022 BMW M3, available at the IAAI salvage car auction as lot 42026142 in Lake City, GA. This car has Front end main damage. It is listed with Not provided start condition code. Odometer shows 96,679 mi. This Green BMW M3 Sedan is equipped with Gasoline 3.0 L engine, RWD drivetrain, Manual transmission. Check the vehicle history report for WBS53AY03NFL94517 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.
Sharing our own experience
Over the years, we’ve learned all the ins and outs of car importing — so you don’t have to.
How it works
A full step-by-step guide that walks you through the entire process — from signing up to receiving your car at your doorstep. Clear & beginner-friendly.
Purchase process
Knowledge base
A structured library of content covering every major topic in car importing — including terms, rules, key concepts, and important real-world nuances.
Import encyclopedia
Watch & learn
Short, practical videos packed with tips from real experience. No fluff, no theory — just what actually helps when importing a car from the US to Poland.
Watch guides














































