2016 BMW M4

3.0 L • 6 • 425 hp • RWD • AT

WBS3R9C56GK336919

Highlights
Condition
Run and drive
Seller
InsuranceState Farm Insurance
Key included
Yes
Document status
Bad
History
1 record
Drive
3.0 L • 6 • 425 hp • RWD • AT
Odometer
57,302 mi ≈ 92,218 km
Primary damage
Front end
Loss type
Collision
Document type
WA • Bill Sale
Extra
Auction
VIN
WBS3R9C56GK336919
Lot number
42623587
IAAI
Sale status
Sold via Timed auction
Seller type
Insurance
Seller
State Farm Insurance
Auction date
Location
Puyallup, WA
ACV
$36,613
Description
Fuel type
Gasoline
Body color
Light Blue
Body type
Coupe
Generation
F82, F83
All sales final. Always run reports before bid

2016 BMW M4 • 3.0 L • 6 cyl • 425 hp • RWD • Automatic • IAAI Lot: 42623587 • VIN: WBS3R9C56GK336919

Find out more about this 2016 BMW M4, available at the IAAI salvage car auction as lot 42623587 in Puyallup, WA. This car has Front end main damage. It is listed with Run and drive start condition code. Odometer shows 57,302 mi. This Light Blue BMW M4 Coupe is equipped with Gasoline 3.0 L engine, RWD drivetrain, Automatic transmission. Check the vehicle history report for WBS3R9C56GK336919 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.