2024 BMW M4 Competition xDrive

3.0 L • 6 • 503 hp • 4×4 • AT

WBS43AZ07RCN3519904/2023

LotAuction dateFinal bidSellerOdometerStatus
17.12.2025$15,800GEICO4,811 miNot sold
24.12.2025$20,025GEICO4,811 miSold
Highlights
Condition
Not provided
Seller
InsuranceGEICO
Key included
Yes
Document status
Good
History
2 records
Drive
3.0 L • 6 • 503 hp • 4×4 • AT
Odometer
4,811 mi ≈ 7,743 km
Primary damage
Rollover
Secondary damage
All over
Loss type
Collision
Document type
NY • MV-907A
Extra
Auction
VIN
WBS43AZ07RCN35199
Lot number
43642485
IAAI
Sale status
Sold by Buy now
Seller type
Insurance
Seller
GEICO
Auction date
Location
Rock Tavern, NY
ACV • ERC
$79,204 • $75,434
Description
Fuel type
Gasoline
Body type
Coupe
Generation
G82, G83
Trim
Competition xDrive
Body color
Black
Interior color
Brown
Plant country
Germany
Production month
04/2023Year in documents
All sales final. Always run reports before bid

2024 BMW M4 Competition xDrive • 3.0 L • 6 cyl • 503 hp • 4×4 • Automatic • IAAI Lot: 43642485 • VIN: WBS43AZ07RCN35199

Find out more about this 2024 BMW M4 Competition xDrive, available at the IAAI salvage car auction as lot 43642485 in Rock Tavern, NY. This car has Rollover main damage. It is listed with Not provided start condition code. Odometer shows 4,811 mi. This Black BMW M4 Coupe is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS43AZ07RCN35199 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.