2023 BMW M3 Competition xDrive

3.0 L • 6 • 503 hp • 4×4 • AT

WBS43AY03PFP95645

Highlights
Condition
Engine starts
Seller
InsuranceProgressive Insurance
Key included
Yes
Document status
Good
History
2 records
Drive
3.0 L • 6 • 503 hp • 4×4 • AT
Odometer
18,591 mi ≈ 29,919 km
Primary damage
Front end
Loss type
Collision
Document type
AZ • Salvage
Extra
Auction
VIN
WBS43AY03PFP95645
Lot number
43794076
IAAI
Sale status
Sold by Buy now
Seller type
Insurance
Seller
Progressive Insurance
Auction date
Location
Phoenix, AZ
ACV • ERC
$87,394 • $42,909
Description
Fuel type
Gasoline
Body color
Blue
Body type
Sedan
Generation
G80
Trim
Competition xDrive
All sales final. Always run reports before bid

2023 BMW M3 Competition xDrive • 3.0 L • 6 cyl • 503 hp • 4×4 • Automatic • IAAI Lot: 43794076 • VIN: WBS43AY03PFP95645

Find out more about this 2023 BMW M3 Competition xDrive, available at the IAAI salvage car auction as lot 43794076 in Phoenix, AZ. This car has Front end main damage. It is listed with Engine starts start condition code. Odometer shows 18,591 mi. This Blue BMW M3 Sedan is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS43AY03PFP95645 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.