2025 BMW M3 Competition xDrive
3.0 L • 6 • 523 hp • 4×4 • AT
WBS33HJ01SFV12263
Sales history: 1
Highlights
Condition
Run and drive
Seller
Insurance • State Farm Insurance
Key included
Yes
Document status
Good
History
1 record
Drive
3.0 L • 6 • 523 hp • 4×4 • AT
Odometer
187 mi ≈ 301 km
Primary damage
Front end
Secondary damage
Unknown
Loss type
Collision
Document type
NY • MV-907A
Extra
Auction
VIN
WBS33HJ01SFV12263
Lot number
42571639
IAAI
Sale status
Sold
Seller type
Insurance
Seller
State Farm Insurance
Auction date
Location
Medford, NY
ACV
$98,826
Description
Fuel type
Gasoline
Body color
Green
Body type
Sedan
Generation
G80
Trim
Competition xDrive
All sales final. Always run reports before bid
2025 BMW M3 Competition xDrive • 3.0 L • 6 cyl • 523 hp • 4×4 • Automatic • IAAI Lot: 42571639 • VIN: WBS33HJ01SFV12263
Find out more about this 2025 BMW M3 Competition xDrive, available at the IAAI salvage car auction as lot 42571639 in Medford, NY. This car has Front end main damage. It is listed with Run and drive start condition code. Odometer shows 187 mi. This Green BMW M3 Sedan is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS33HJ01SFV12263 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.
Sharing our own experience
Over the years, we’ve learned all the ins and outs of car importing — so you don’t have to.
How it works
A full step-by-step guide that walks you through the entire process — from signing up to receiving your car at your doorstep. Clear & beginner-friendly.
Purchase process
Knowledge base
A structured library of content covering every major topic in car importing — including terms, rules, key concepts, and important real-world nuances.
Import encyclopedia
Watch & learn
Short, practical videos packed with tips from real experience. No fluff, no theory — just what actually helps when importing a car from the US to Poland.
Watch guides










































