2024 BMW M3 Competition xDrive

3.0 L • 6 • 543 hp • 4×4 • AT

WBS43AY0XRFS26150

Highlights
Condition
Engine starts
Seller
InsuranceAuto Club of Southern California
Key included
Yes
Document status
Good
History
1 record
Drive
3.0 L • 6 • 543 hp • 4×4 • AT
Odometer
12,984 mi ≈ 20,896 km
Primary damage
Front end
Loss type
Collision
Document type
CA • Salvage
Extra
Auction
VIN
WBS43AY0XRFS26150
Lot number
41396512
IAAI
Sale status
Sold
Seller type
Insurance
Seller
Auto Club of Southern California
Auction date
Location
Carson, CA
ACV
$91,726
Description
Fuel type
Gasoline
Body color
Black
Body type
Sedan
Generation
G80
Trim
Competition xDrive
All sales final. Always run reports before bid

2024 BMW M3 Competition xDrive • 3.0 L • 6 cyl • 543 hp • 4×4 • Automatic • IAAI Lot: 41396512 • VIN: WBS43AY0XRFS26150

Find out more about this 2024 BMW M3 Competition xDrive, available at the IAAI salvage car auction as lot 41396512 in Carson, CA. This car has Front end main damage. It is listed with Engine starts start condition code. Odometer shows 12,984 mi. This Black BMW M3 Sedan is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS43AY0XRFS26150 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.