2024 BMW M3 Competition xDrive
3.0 L • 6 • 543 hp • 4×4 • AT
WBS43AY00RFS67290
Sales history: 1
Highlights
Condition
Run and drive
Seller
Insurance • GEICO
Key included
Yes
Document status
Good
History
1 record
Drive
3.0 L • 6 • 543 hp • 4×4 • AT
Odometer
10,792 mi ≈ 17,368 km
Primary damage
Front end
Secondary damage
Front end
Loss type
Collision
Document type
NY • MV-907A
Extra
Auction
VIN
WBS43AY00RFS67290
Lot number
42329346
IAAI
Sale status
Sold
Seller type
Insurance
Seller
GEICO
Auction date
Location
Staten Island, NY
ACV
$87,428
Description
Fuel type
Gasoline
Body color
Gray
Body type
Sedan
Generation
G80
Trim
Competition xDrive
All sales final. Always run reports before bid
2024 BMW M3 Competition xDrive • 3.0 L • 6 cyl • 543 hp • 4×4 • Automatic • IAAI Lot: 42329346 • VIN: WBS43AY00RFS67290
Find out more about this 2024 BMW M3 Competition xDrive, available at the IAAI salvage car auction as lot 42329346 in Staten Island, NY. This car has Front end main damage. It is listed with Run and drive start condition code. Odometer shows 10,792 mi. This Gray BMW M3 Sedan is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS43AY00RFS67290 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.
Sharing our own experience
Over the years, we’ve learned all the ins and outs of car importing — so you don’t have to.
How it works
A full step-by-step guide that walks you through the entire process — from signing up to receiving your car at your doorstep. Clear & beginner-friendly.
Purchase process
Knowledge base
A structured library of content covering every major topic in car importing — including terms, rules, key concepts, and important real-world nuances.
Import encyclopedia
Watch & learn
Short, practical videos packed with tips from real experience. No fluff, no theory — just what actually helps when importing a car from the US to Poland.
Watch guides












































