2024 BMW M3 Competition xDrive

3.0 L • 6 • 543 hp • 4×4 • AT

WBS43AY08RFS19830

Highlights
Condition
Run and drive
Seller
InsuranceProgressive Insurance
Key included
Yes
Document status
Good
History
2 records
Drive
3.0 L • 6 • 543 hp • 4×4 • AT
Odometer
10,330 mi ≈ 16,624 km
Primary damage
Side
Loss type
Collision
Document type
IL • Salvage
Extra
Auction
VIN
WBS43AY08RFS19830
Lot number
41506228
IAAI
Sale status
Sold
Seller type
Insurance
Seller
Progressive Insurance
Auction date
Location
Markham, IL
ACV • ERC
$89,899 • $56,067
Description
Fuel type
Gasoline
Body color
Gray
Body type
Sedan
Generation
G80
Trim
Competition xDrive
All sales final. Always run reports before bid

2024 BMW M3 Competition xDrive • 3.0 L • 6 cyl • 543 hp • 4×4 • Automatic • IAAI Lot: 41506228 • VIN: WBS43AY08RFS19830

Find out more about this 2024 BMW M3 Competition xDrive, available at the IAAI salvage car auction as lot 41506228 in Markham, IL. This car has Side main damage. It is listed with Run and drive start condition code. Odometer shows 10,330 mi. This Gray BMW M3 Sedan is equipped with Gasoline 3.0 L engine, 4×4 drivetrain, Automatic transmission. Check the vehicle history report for WBS43AY08RFS19830 to access detailed information on accidents, ownership, and title status. Review pricing trends and uncover hidden issues before placing your bid.

We use cookies to improve your experience and analyze site usage, as outlined in our Privacy policy. By closing this message or continuing to browse, you consent to their use.